Recommended Methods and Practices for Timing Analysis and Design within the AUTOSAR Development Process, No.645, 2021-11
AUTOSAR R21-11記事一覧はこちら。
AUTOSAR 21-11,319文書読んだ。2022年6月初初旬にFO, AP, CP 全部到達。
AUTOSAR R21-11(0) 仕様ダウンロード一覧。単語帳。参考文献資料作成
用語(terms)
Term | Description |
---|
英日
日本語は仮訳
T.B.D.
参考(reference)
Glossary も 参考に入れましょう。
[1] Methodology for Classic Platform
AUTOSAR_TR_Methodology
[2] Specification of Timing Extensions
AUTOSAR_TPS_TimingExtensions
[3] Explanation of Adaptive Platform Design
AUTOSAR_EXP_PlatformDesign
[4] Software Process Engineering Meta-Model Specification
http://www.omg.org/spec/SPEM/2.0/
[5] Embedded Systems Development, from Functional Models to Implementations
[6] EAST-ADL - Model Domain Specification
http://www.east-adl.info/Specification.html
[7] Tool Support for the Analysis of TADL2 Timing Constraints using TimeSquare
http://hal.inria.fr/docs/00/85/06/73/PDF/paper.pdf
[8] Unified Modeling Language: Superstructure, Version 2.0, OMG Available Specification, ptc/05-07-04
http://www.omg.org/cgi-bin/apps/doc?formal/05-07-04
[9] System Modeling Language (SysML)
http://www.omg.org/spec/SysML/1.3/
[10] UML Profile for Modelling and Analysis of Real-Time and Embedded systems
(MARTE)
http://www.omg.org/spec/MARTE/1.1/
[11] Architecture Analysis and Design Language (AADL) AS-5506A
http://standards.sae.org/as5506a/
[12] TIMMO-2-USE
[13] Specification of Operating System
AUTOSAR_SWS_OS
[14] Scheduling algorithms for multiprogramming in a hard real-time environment
http://cn.el.yuntech.edu.tw/course/95/real_time_os/present paper/Scheduling Algorithms for Multiprogramming in a Hard-.pdf
[15] Controller Area Network (CAN) Schedulability Analysis: Refuted, Revisited and
Revised
http://dl.acm.org/citation.cfm?id=1227696
[16] Pushing the limits of CAN-Scheduling frames with offsets provides a major performance
http://www.loria.fr/ nnavet/publi/erts2008_offsets.pdf
9 of 162 Document ID 645: AUTOSAR_TR_TimingAnalysis
Recommended Methods and Practices for Timing
Analysis and Design within the AUTOSAR
Development Process
AUTOSAR FO R21-11
[17] Probabilistic response time bound for CAN messages with arbitrary deadlines
http://ieeexplore.ieee.org/xpl/abstractAuthors.jsp?arnumber=6176662
文書履歴(document history)
ver. 0.01 初稿 20220607