Requirements on Gateway, No.6, 2021-11
AUTOSAR R21-11記事一覧はこちら。
AUTOSAR 21-11,318文書読んだ。2022年6月初めにFO, AP, CP 全部到達。
AUTOSAR R21-11(0) 仕様ダウンロード一覧。単語帳。参考文献資料作成
目的と成果(Purpose and Outcome)
item | description |
---|---|
who | Gateway designer |
what | CAN, Lin and Flexray only. Ethernet may be out of scope. |
importance | high |
others | |
comment | Please read v.2 or v.3, there are initiaters. |
用語(terms)
Term | Description¥ |
---|---|
Routing Configuration | Configuration data that controls the operation of the PDU Router and Signal Gateway. The configuration data defines the destination for each PDU of the PDU Router and each Signal of the signal gateway. The routing configuration should be encapsulated in a way that allows an update. |
Gw | Abbreviation of signal based gateway. |
Gatewaying-on-the-fly | PDU Gateway capability; routing between two TP modules where forwarding of data is started (when a specified threshold is reached) before all data have been received. |
英日
日本語は仮訳
T.B.D.
参考(reference)
[1] Standardization Template, AUTOSAR_TPS_StandardizationTemplate
[2] General Requirements on Basic Software Modules, AUTOSAR_SRS_BSWGeneral
文書履歴(document history)
ver. 0.01 初稿
ver. 0.02 (Purpose and Outcome are added. 20220604