0
1

Delete article

Deleted articles cannot be recovered.

Draft of this article would be also deleted.

Are you sure you want to delete this article?

More than 1 year has passed since last update.

Requirements on Gateway, No.6, AUTOSAR R21-11(154) CP

Last updated at Posted at 2022-05-24

Requirements on Gateway, No.6, 2021-11

AUTOSAR R21-11記事一覧はこちら。

AUTOSAR 21-11,318文書読んだ。2022年6月初めにFO, AP, CP 全部到達。

AUTOSAR R21-11(0) 仕様ダウンロード一覧。単語帳。参考文献資料作成

目的と成果(Purpose and Outcome)

item description
who Gateway designer
what CAN, Lin and Flexray only. Ethernet may be out of scope.
importance high
others
comment Please read v.2 or v.3, there are initiaters.

用語(terms)

Term Description¥
Routing Configuration Configuration data that controls the operation of the PDU Router and Signal Gateway. The configuration data defines the destination for each PDU of the PDU Router and each Signal of the signal gateway. The routing configuration should be encapsulated in a way that allows an update.
Gw Abbreviation of signal based gateway.
Gatewaying-on-the-fly PDU Gateway capability; routing between two TP modules where forwarding of data is started (when a specified threshold is reached) before all data have been received.

英日

日本語は仮訳

T.B.D.

参考(reference)

[1] Standardization Template, AUTOSAR_TPS_StandardizationTemplate
[2] General Requirements on Basic Software Modules, AUTOSAR_SRS_BSWGeneral

文書履歴(document history)

ver. 0.01 初稿
ver. 0.02 (Purpose and Outcome are added. 20220604

0
1
0

Register as a new user and use Qiita more conveniently

  1. You get articles that match your needs
  2. You can efficiently read back useful information
  3. You can use dark theme
What you can do with signing up
0
1

Delete article

Deleted articles cannot be recovered.

Draft of this article would be also deleted.

Are you sure you want to delete this article?